- 1. Please read carefully before using the product description Introduction
- 2, in front of a large area of use, please do a small area of the experiment
- 3. Make sure that the sticky surface clean and dry
- 4, the optimum operating temperature should be between 18-32 degrees
- 5, the product can be used directly as needed openings evenly coated in sticky surface
- 6, wait 3-6 minutes, the two are aligned adhesive sticky little pressure
- 7, put a few hours straight, 48 hours after the optimum adhesive strength
- 8, when the product is not the cap after Shang Hao avoid contact with air cured glue